Agra, , India
Electrical Maintenance, SCADA, PLC Programming
0 टिप्पणी करें | 1 राय | 03 मार्च 19  | Shubham Sharma
The whole project based on PLC programming in which it First intalled (set up) the software of PLC (Allen Bradley) and then the programme will put into the PLC of project.PLC will control the IR sensors and motors through the programme which is installed in it so that when the train comes near, the IR sensor will detect and sent the signal to plc through which the barrier will be close with the help of motor and after the train passes, the IR sensor again detect and send the signal to the plc by which it will open the barrier with the help of the motor. The obstacle sensor is located between both the barrier so that if any obstable ( people or animal) comes in between the barrier, it will sense and send the signal to plc by which it indicate the alarm and glow red light to alert the driver. So that the train will be stop . All this happen with the help of PLC which totally control the IR sensor and motor by set up the programme (Allen Bradley) in it.

    • इस ब्लॉग के लिए सामाजिक शेयर

पोर्फोलिओ और ब्लॉग
Shubham Sharma विभिन्न कंपनियों का अनुसरण करता है, ये कंपनियां और नियोक्ता Shubham के फिर से शुरू देख सकते हैं
सबसे अच्छा नौकरी के अवसर पाने के लिए अपना फिर से शुरू करें अपलोड करें

मुफ्त रजिस्टर करें!