Pune, Maharashtra, India
Profile Snapshot
Abhay is based out of Pune & has studied ME-Mechanical Engineering, BE BTech-Bachelor of Engineering or Technology from Year 2000-2004 in AIAE-Amity Institute Of Aerospace Engineering, Amity University.
Abhay Joshi is Skilled in Other or Otro, Communication Skills, Welding and other talents.
Talents
    • Sheet Metal Worker
      ... among 0 users in Pune
      among 0 users worldwide
    • Communication Skills
      ... among 0 users in Pune
      among 0 users worldwide
    • CNC Programming
      ... among 0 users in Pune
      among 0 users worldwide
    • Welding
      ... among 0 users in Pune
      among 0 users worldwide
Professional Path
General Manager Operations
Jan-2016 To present 9 years 7 months
  • Responsible for entire plant operations, new projects
Project Manager
Jun-2015 To Dec-2015 6 months
  • Responsible for executing new projects
  • completed 3 projects in 6 months
Manager Mini- Factory
Jun-2008 To Apr-2015 6 years 10 months
  • Presently responsible for entire manufacturing of P-EGR, EM EGR, Oil Pump, Vacuum pump, water pump, New product development.
  • Successfully installed and tested all machines and assembly lines.
    Started the serial production in 3 month
    Successfully implemented quality system & production System Company.
    Trained to all people in production.
    Completed 14 PPAP in 6 months.
    Successfully implemented SAP system in Production & WH.
    Successfully launch of 12 new products.
    TS certification with zero non conformance.
    Increases productivity by 22% & 40 % for P-EGR and pump respectively.
Dy. Manager
Nov-2004 To Jan-2008 3 years 2 months
  • ? Heading the ORVM & IRVM, Gear Shifter, Molding, and Washer System Sections.
  • Trouble free supply to OEMs. 100% on time delivery.
    Implemented 6 Sigma projects resulting into streamlined process with high reliability. Internal rework reduced and customer complaints reduced zero
    ( GSL assembly)
    Productivity increased 15% through process improvements,
    Layout changes and one-piece flow saved 25 % space.
    Pivotal in maintaining Zero PPM & 100 % delivery for Honda & GM for last 3 Years.
    Launching of new products into production and streamlining the launch activity from part development till PPAP.
    ? Responsible for plant wide improvement activity involving process improvements, housekeeping, material storage, inventory.
    ? Implemented ASES activity on shop floor.
    ? Reduce non-moving inventory by 30 Lac
    ? Responsible for completing the customer audit such Honda, Ford, TML, M&M Toyota.
    ? Implemented effective planning system for mix product lines.
Factory Manager
Nov-2000 To Mar-2004 3 years 4 months
  • Total responsible for factory operations.
  • Efficiently coordinated with all Government bodies State & Central as representative of Factory.
    Compliance with various provisions of the Factories Acts, Industrial disputes Acts, the Labour Welfare Acts, and State & Central legislation.
    Initiated in-House production of 40 press parts
    Achieved ISO 9000 certification for company.
    Distinction of increasing sales by 400 %.
    Successfully increased production of DV.
    Pivotal in reducing
    Weight of chassis/ Customer complaint.
    Transport cost 75K per month.
Product Manager
Jan-1997 To Oct-2000 3 years 9 months
  • Heading Valves division, Boiler division, and machine shop and assembly.
  • Successfully increased Valves production of all sizes by 50 %
    Initiated fabricating SS PRS station
    Product ionized Perforation type control valves.
    Instrumental in reducing
    IBR cost by 50 % per month
    Rejection of casting & flange by 40%
    Set-up time of CNC machine by 35 %
    Initiated production of PRS station.
    Efficiently introduced Cell concept in Machine shop.
    Implement 5s Activity in Machine shop & Boiler shop.
    Implemented ERP system in Production planning Valves Division and handled overall Production activities.
    ? Spirax Division and managed the Machine shop and fabrication shop having state-of-the-art CNC and conventional Machines.
    ? Fabrication shop manufacturing IBR and non-IBR boilers PRS Stations, Steam traps as per customer requirement &small capacity water Tube Boilers.
Asst. Manager
Oct-1982 To Jan-1997 14 years 3 months
  • Responsible for Scooter and 3-wheeler entire production
  • Work in manufacturing engineering dept.
    Implemented cell concept in chassis and assembly department.
    Increased in production by 120% in scooter assembly line & chassis line.
    Optimum utilization of space. Saved 40 % by rearranging layout.
    Set up welding production line for the new models.
    25 % increase in stamping strokes in press shop.
    Reduction in non-value added operations.
    Installed robots for projection welding and TIG welding.
Qualifications

Amity Institute Of Aerospace Engineering

Bachelor of Engineering or Technology Mechanical Engineering

2000-2004

-%

Extra-Curricular Interests
Taking groups for trekking
My Story
BE Mechanical With,30+ years of experience in Manufacturing, Production management, supply chain management, New product development, Quality management, cost control and budgetary, Man management. Process enhancement.