Raipur, Chhattisgarh, India
Profile Snapshot
Alok is based out of Raipur & has studied CE-Civil Engineering, ME MTech-Master of Engineering or Technology from Year 1994-1996 in IITR-Indian Institute of Technology Roorkee, Public University.
Alok Choubey is Skilled in Project Management, Aptitude, Strategic Planning and other talents.
Talents
    • Strategic Planning
      ... among 0 users in Raipur
      among 0 users worldwide
      60.22
      percentile among worldwide users
    • Contract Management
      ... among 0 users in Raipur
      among 0 users worldwide
    • Project Management
      ... among 0 users in Raipur
      among 0 users worldwide
      99.75
      percentile among worldwide users
    • Statutory Compliance
      ... among 0 users in Raipur
      among 0 users worldwide
Professional Path
Project Manager
Jun-2016 To present 9 years 2 months
  • Major Project: New Raipur (Integrated Green Field Smart City) for Infrastructure Development Project and Multi-story High Rise Commercial Complex with Multiplex Project, Command / Control Centre and Auditorium Project for Naya Raipur Developing Authority Key Result Areas: Anchoring onsite construction activities about 1 Lacs sq. mt. retail area spread into 6 buildings with 2 towers as High Rise Buildings, with 25,000 sq. mt. hardscape area/ soft scape area, 1000 person seating capacity auditorium, overall area development of sector level infrastructure with laying of utilities pipes (water and waste water), road works to ensure completion of project within the time & cost parameters and effective resource utilization to maximize the output Tracking, monitoring and forecasting progress of all activities and deliverable products such as engineering documents and work status Participating in schedule review meeting, progress meeting, co-ordination meeting, construction review m
General Manager
GMR Energy Full Time
Mar-2007 To Apr-2016 9 years 1 months
  • Role:General Manager
    Planned the entire project from Bid stage to start of construction, and got all the necessary approvals like Forest Clearance, Environment Clearance, DPR approval from CEA, SPCB cleaapprovals from various government departs including Land Actuations/ Diversion of forest land and their compliances required for execution of projects, Planning and Scheduling of Works, Financial Closure documentation with interaction Financial Institutions and their agents, Comprehensive Project Insurance and interaction with Insurance Agencies, ALoP monitoring agency, Filing of Insurance Claims, Loss surveyors, Interacted with Legal Counsels for various litigations during initial execution of projects and represented company, Contract document preparation and Management for works contracts / consultants, SLAs, NDAs, Statutory and Internal Auditors, budgeting with cost control, and Resource planning, MIS and certification of Invoices. Undertake review and compilation of DPR, EIA/ EM
Project Manager
Apr-2006 To Mar-2007 11 months
  • • Worked as Owner’s Engineering Manager for Lachung Chu Hydro Electric Projects (270 MW), for Polyplex corporation Ltd. Three cascade projects are located on river Lachung Chu in North Sikkim. Responsibilities included Coordination with Govt. agencies, Consultants, Contractors, control on Technical aspects, Budgeting, Resource planning, and other studies.
Group Engineer
JP Ventures Full Time
Jun-2004 To Apr-2006 1 years 10 months
  • • Worked as Lead Engineer for JP Himachal Cement Plant (3 MT Clinker) for JP cement. Responsible for project scheduling, resource planning, project monitoring, interaction with E & M consultant and vendors, preparation of quality assurance plan, tender specifications, cost estimates and documentation specialist. Designed the Pre Heater tower building (150m high), coal storage yards superstructure, change towers, ESP supports and other structures.
Senior Engineer
Mar-1996 To Jun-2004 8 years 3 months
  • • Worked as PROJECT COORDINATOR for Essel Packaging Plant, Baroda retrofitting works. Responsibilities include mapping of the damages in the plant; suggest investigations and retrofitting works including drawings.

    • Worked as PROJECT COORDINATOR for Seismic Design of Shielding Doors and Blisters for BARC. Responsible for service level- C floor response spectrum FEM dynamic analysis, generation of floor response spectra, broadening, smoothing and enveloping of spectra, along with analysis for missing mass correction.

    • Worked as specialist engineer for Ghatghar HEP (250 MW), for Govt. of Maharastra. A Pumped storage scheme involves the construction of first of its kind in India, 3 nos of Roller Compacted Concrete gravity dams. Work responsibilities included were Thermal analysis, FEM response spectrum analysis of dam, along with design of dam ancillary structures. The lower dam is 87 meter high and 450 meter long.

Qualifications

Indian Institute of Technology Roorkee

Master of Engineering or Technology Civil Engineering

1994-1996

-%

Government Engineering College Jabalpur

Bachelor of Engineering or Technology Civil Engineering

1990-1994

80%

My Story
Versatile professional, successful in executing prestigious projects within strict time schedule, cost & quality as per the project management & best practice guidelines & norms;