TPM-Total Productive Maintenance, Public Utility
About
1. Presently working with M/s. Brahm Precision Material Pvt. Ltd, Aurangabad. As a General Manager reporting to Business Head/ CEO.
2. Expertise in handling & leading the entire plant activities entailing planning, resource utilization, quality management & manpower management.
3. Reporting manpower strength was + 150 (Direct & Indirect).
4. Demonstrated excellence in planning, executing, managing and spearheading all plant activities.
5. Good team building skill.
Talents
Work Experience
General Manager (HPDC)
M/s Brahm Precision Material Pvt Ltd
Full Time Dec-2017 To present 7 years 4 months
Responsibilities
  • • Heading techno-commercial operations for HPDC die casting of aluminum components to meet the top and bottom line. • Vast Experience in Foundry as well as Machine shop. • Overall management inclusive of strategic planning for capacity enhancement as well as expansion. • Responsible for implementation of world class manufacturing for OEMS and export customers. • Technology up gradation and localization by effectively coordinating with the Japanese teams by developing in-house design and product features and process capability. • Cost control through VA/VE - process and Yield improvements • Provide overall Business leadership to the team in the competitive automotive components manufacturing market. • Responsible for implementation of world class manufacturing & quality management systems, through lean management and six sigma systems. • Continuous improvement of process capability though improvement tools. • Direct and coordinate plant operations through value stream analysis to mee
DGM- Operations
Aurangabad Electrical Ltd.
Full Time Jun-2016 To Sep-2018 2 years 3 months
Responsibilities
  • • Heading techno-commercial operations for HPDC die casting of aluminum components complete export parts (Bearing Housing OM654, Spiral Housing OM654, AJ200 JLR Bearing Housing, ECU Covers, HDEP Cover, HDEP Housing…etc),to meet the top and bottom line.
    • Vast Experience in Foundry as well as Machine shop.
    • Overall management inclusive of strategic planning for capacity enhancement as well as expansion.
    • Responsible for implementation of world class manufacturing for OEMS and export customers.
    • Technology up gradation and localization by effectively coordinating with the Japanese teams by developing in-house design and product features and process capability.
    • Cost control through VA/VE - process and Yield improvements
    • Provide overall Business leadership to the team in the competitive automotive components manufacturing market.
    • Responsible for implementation of world class manufacturing & quality management systems, through lean management and six sigma projects.
Achievements
  • Within Year convert the loss making company in to profit upto 15 % EBITDA.
Deputy General Manager (Head Operation & Maintenance) / Deputy Plant Head.
Kiran Udyog Pvt. Ltd., Manesar
Full Time May-2015 To Jun-2016 1 year 1 month
Responsibilities
  • 1. Heading techno-commercial operations for HPDC die casting of aluminium components aluminium transmission, hubs, clutch covers, grips, auto electric Al parts etc. to meet the top and bottom line.
    2. Responsible for the complete Operations for more than Rs 150 Cr turnover in the current year.
    3. Overall management inclusive of strategic planning for capacity enhancement as well as expansion
    4. Responsible for implementation of world class manufacturing for OEMS and export customers.
    5. Technology up gradation and localisation by effectively coordinating with the Japanese teams by developing in-house design and product features and process capability.
    6. Cost control through VA/VE - process and Yield improvements
    7. Provide overall Business leadership to the team in the competitive automotive components manufacturing market.
    8. Translate overall strategy into Annual Operating plan though MPCP to meet budget for Rs 150 Cr and to effectively translate to 450 Cr by 2018.
Achievements
  • 1. Recondition of HPDC machine.
    2. AMC OF IMM machines.
    3. New Panel up-gradation for HPDC machine.
    4. VMC machine partial reconditioning.
AGM (Head Project & Maintenance)
AMTEK Auto Ltd
Full Time Mar-2013 To Apr-2015 2 years 1 month
Responsibilities
  • • Stream lined all the maintenance activity of the company to meet the business requirements.
    • Devised cost saving measures & modifications to achieve substantial reduction in terms of man days, raw material, energy consumption & all the related overheads as per business plan.
    • Executed installation and commissioning of industrial machineries.
    • Monitored and control of TS 16949 & OHSAS 14001 & TPM activity.
    • Ensured execution of new developments & projects in co-ordination with Projects Dept.
    • Ensured good housekeeping and safe working to achieve OEE, improve availability of equipments.
    • Adhered to company policies towards Process, Quality, Environment, health & Safety.
    • Trained people for analyze all the breakdowns and attack the root cause to prevent recurrence of the breakdown.
    • Trained on how to improve MTBF, MTTR, OEE, CBM, TBM… etc. To staff & associates.
    • Team building and team motivation.
    • Technical guidance to all the maintenance team members.
Achievements
  • 1. Cost saving through energy saving was @ 68.3 Lac per Annum.
    2. IDRA 1500-ton machines recondition started in-house.
Head maintenance (Senior Manager)
Indiana Gratings Pvt. Ltd.
Full Time Aug-2011 To Mar-2013 1 year 7 months
Responsibilities
  • 1. Develop maintenance systems and procedure for effective functioning of Maintenance department
    2. Ensure machines are well up kept and any breakdowns reported are attended to immediately
    3. Analyze all the breakdowns and attack the root cause to prevent recurrence of the breakdown
    4. Lead the plant wide TPM implementation initiative
    5. Training on how to improve MTBF, MTTR, OEE, CBM, TBM… etc. To staff & associates.
    6. Ensure adherence to preventive maintenance schedule
    7. As a mandatory member of cost reduction team and suggestion review committee, ensure timely implementation of cost reduction initiatives and approved suggestions.
    8. Utilizing all the resources (Men, Material & Equipments) effectively to maximize the output
    9. Team building and team motivation.
    10. Ensuring the availability of machines maintenance spares in stores.
    11. Technical guidance to all the maintenance team members as and when requires.
    12.Handling all 5- plants maintenance & projects activities.
Achievements
  • 1. Cost saving projects done @ 75.09 Lac per Annum.
    2. Cost saving through energy saving was @ 5.6 Lac per Annum.
    3. 5 to 6 machines partial recondition done in-house.
Asst. Manager Maintenance
Gabriel India Ltd.
Full Time Dec-2008 To Jul-2011 2 years 7 months
Responsibilities
  • 1. Ensure machines are well up kept and any breakdowns reported are attended to immediately
    2. Analyze all the breakdowns and attack the root cause to prevent recurrence of the breakdown
    3. Plant wide TPM implementation initiative
    4. Improve MTBF, MTTR, OEE, CBM, TBM… etc.
    5. Ensure adherence to preventive maintenance schedule
    6. Utilizing all the resources (Men, Material & Equipments) effectively to maximize the output
    7. Support and encourage employees’ participation in Suggestion Scheme and Kaizen implementation.
    8. Team building and team motivation.
    9. Technical guidance to all the maintenance team members as and when requires.
Achievements
  • 1. RO plant introduces.
    2. Total 256 machines relay outing to minimize the material movements & better space utilization
Asst. Manager Maintenance
Endurance Technologies Pvt. Ltd.
Full Time Jun-2005 To Dec-2008 3 years 6 months
Responsibilities
  • 1. RO plant introduces.
    2. Complete Shop installation & commissioning of all machines.
    3. CNC machine (HMC-04, VMC-09).
    4. Quality testing area.
    5. Electrical work (Power cabling, Lighting…etc)
    6. Utility supply (Cooling line, air line).
    7. Utility (ETP) up gradation.
    8. Total machine shop (conventional machines shifting to new location with its all utility work) (machines-38 no).
Maintenance Engineer
Aurangabad Electrical Pvt. Ltd.
Full Time Sep-1998 To Jun-2005 6 years 9 months
» 1 Project
Education
Master of Business Administration, Operations
Apex Institute of Management and ScienceMahatma Gandhi University
2010-2011 Score69%
Bachelor of Engineering or Technology
I T S Engineering CollegeDoon University
2004-2005 Score62%
Diploma in Engineering, Mechanical Engineering
Bajaj Chandrapur PolytechnicMumbai University
1997-1998 Score68%
Profile Snapshot
Harishchandra is based out of Aurangabad & has studied Operations, MBA-Master of Business Administration from Year 2010-2011 in AIMS-Apex Institute of Management and Science, Mahatma Gandhi University.
Harishchandra Adhirkumar Bala is Skilled in TPM-Total Productive Maintenance, Public Utility, Plant Maintenance and other talents.